Guideline for Designing Fire Hydrant















Location of fire hydrant - maximum distance between hydrant.

Sunday 23 December 2012

Blasting Operation for Quarry


















Blasting Operation
keywords:
blasting, cordtex, explosive primer, emulite 150


爆破作業
關鍵字:
爆破,cordtex,爆炸性的引物,emulite150


Thursday 13 December 2012

Contract - Interpretation of Drawings and Specification





















keywords :
- accuracy of construction drawin gs
- contractor's responsiblity to check
- minor deviation

Wednesday 12 December 2012

Dredging Survey -Method of Statement


















keywords: Pre-dredge , intermediate, survey, sea-bed levelsm reclaimation, spacing, lines, dumping aream breakwater, cross-lines, grid

Sunday 28 October 2012

Manpower Loading Histogram

















Example of Manpower loading histogram for a company. The histogram is always requested by prospective client to check the capacity of a company to be engaged for a service.

Friday 12 October 2012

Settlement Marker






















Detail of Settlement Marker used for monitoring embankment fill in highway project.

Sunday 16 September 2012

Fire Hydrant with Hose Box - Detail Layout
















Detail of Fire Hydrant with Hose Box.

keywords: [200mm fire main, instantaneous outlet hydrant valve., foundation ]

Wednesday 12 September 2012

Detail of Subsoil Drain



















Detail of Subsoil Drain.
keywords : sub soil pipes, porous pipe, crusher rock, binder course, sub base, sand blanket, filter material

Tuesday 4 September 2012

Specification - Lubricant Adhesive
























Lubricant Adhesive :
keywords: polyurethane,hydrocarbon solvent mixture, elongation, galvanising, affidavit

Friday 31 August 2012

Welding Works - UT Scanning for Tubular Surface Pipes















UT Scanning Position on Tubular Surfaces
Keyword:  welding, method of statement, pipes, steelworks, offshore

Wednesday 15 August 2012

Compactor Plant for Road works






















Number of passes for three different type of compactor (Vibrating Plate Compactor, Vibro Tamper and Power rammer or dropping weight compactor)

keywords: static pressure, rammer, passes , layer thickness

Monday 16 July 2012

Specification - Roof Metal Roofing

















Roof Metal Sheets :
keywords: Metal SHeeting, BS 1449 Part 1, cold reduced sheets, Grade 34/20 , matte finished , asymmetrical trapezoidal profilem 22 SWG, BS 2989, coating weight, manufacturer, hot dip galvanised.

Friday 6 July 2012

Ramp Design Criteria

























Design Criteria of Ramp.
keywords: Clearway, ramp width, headroom, radius , multi level basement car parks, geometric standards,
gradient.

Monday 2 July 2012

Storage of Explosives Material
























Storage of Explosives Material:
keywords : manufacturer , magazine, license, safety, quarry, inflamable, flying rocks, chain link, records, policeman, shotfire  ammonium nitrate, conductorsm ANFO, fuel oil

Wednesday 13 June 2012

Erosion and Sedimentation Control at Construction Site.











keywords: Sedimentation pond, surface run-off, mitigation, erosion, 150 mg per litre, ponds, earthworks

Friday 8 June 2012

Air Condition for LRT, Train or Monorail Coach in Tropical Countries













keywords: Design Dry Bulb, ASHRAE Fundamentals, air conditioned, latent heat , solar radiation







Friday 1 June 2012

Approval of Temporary Work














Keywords: Temporary works, construction, contractor, engineer's approval , relieve.[ Contractor should be made responsible for the all temporary structures required for the duration of a project]

Sunday 27 May 2012

Thursday 24 May 2012

Flakiness Index Test Result




Sample of Flakiness Index Test Result to BS 812 /Part 1 / 1975

Monday 21 May 2012

Offshore Soil Investigation : Equipments



















keywords:
rotary drilling, jack up platform seabed,  electric friction cone

Thursday 17 May 2012

Electrical Specification : Tests on Distribution Boards and Small Power:




















Tests on Distribution Boards and Small Power:

keywords:
Polarity Tests, single pole switches, conductir, insulation resistance, IEE Wiring Regulation, fault loop, continuity test.

Monday 7 May 2012

Wall for Tank Farm


Basic Criteria for Wall or Dike for Tank Farm (Petrochemcial Industries)

Monday 20 February 2012

Project Management - Joint Venture Representative - Responsibilities

Project Management - Joint Venture Representative - Responsibilities
keywords: Project Procedure , Quality Plan, EPCC Contract,