Thursday, 18 December 2014

Hydrostatic Test of Pipeline

Hydrostatic Test of Pipeline


pipeline bundle and risers, hydro test pressure, LPG, Nitrogen, Potable Water, Utility Water, Diesel, Fuel Oil, Gas, operating pressure, Bar

Saturday, 13 December 2014

Project Schedule - Level 1 - Construction of Marine Facilities - EPCC Contract

Project Schedule - Level 1 - Construction of Marine Facilities - EPCC Contract


 - Detail Design

- Steel Piles , Structural Steel,  QRH, Capstan, Bollard, Cathodic Protection. Rocks, Fenders, Navigational Aids, Geotextile, Flexslabs,

Jetty, Beach Protection, Roadways, Dredging, Precast

Friday, 12 December 2014

Steelwork - Beam to Column Connection Detail

Steelwork - Beam to Column Connection Detail

Monday, 8 December 2014

LPG Compressor Shed - Structural Steel Frame

Plan View

Purlin Layout

Cross Section of Shed

Longitudinal Truss

Main Rafter

Friday, 21 November 2014

Wednesday, 5 November 2014

Steelwork Standard Detailing - Horizontal Bracing Connection

Standard detail steel connection ( angle to main steel beam)

Friday, 24 October 2014

Hydro Power Project - Scour Gate - Pulling Force

Hydro Power project - Calculation of Scour Gate pulling force for intake plant.

Tuesday, 26 August 2014

Internal Audit Schedule - Chart

A typical chart showing how internal audit can be schedule.

Monday, 25 August 2014

Architectural Detailing - Standard staircase

Architectural Detailing
- Standard staircase - raisers, nose detailing - screed 1:3 cement content and railing height.

Monday, 4 August 2014

Silt Fence - Construction of Breakwater

Diagram indicating how silt screen/ curtain are being used during the construction of breakwater.

Sunday, 6 July 2014

Vehicular Box Culvert Design

Vehicular Box Culvert .

Size : 10m wide  x 5 m height and about 2m fill
Renforcement detail

Friday, 30 May 2014

Design of Grating Cover

page - 1

page -2

keywords : HA Loading, Calculation, desig, 100 KN, BS5400 Clause 6 , main trench, safe working stress,
175 n/mm2

Sunday, 25 May 2014

Pipeline Detection Method

Pipeline detection - manual approach

Saturday, 24 May 2014

Aircondition Duct Specification

Aircondition Duct Specification
keywords: duct, fibrglass, rockwool, galvanised steel perforated sheet,  WCP supply air, return air duct, absorbtion material

Wednesday, 21 May 2014

Elastomeric Bearing Design

Design calculation of Elastomeric Bearing for bridges.
keywords: rubber layer thickness, shear deflection, vertical deflection, compression stiffness

Tuesday, 6 May 2014

International Roughness Index (IRI) Criteria for Highway Project

(IRI) International Roughness Index for roadworks.
keywords : pavement surface, highway, roadworks, project, test, Single Track IRI, Wearing course surfacing, Binder Course Surfacing, Lane IRI Value, Road profile, Grade

Sunday, 4 May 2014

Deck Slab Reinforcement - 40m span bridge 7m wide deck

Typical Deck Slab Reinforcement - 40m span bridge 7m wide deck continuous for live load.
keywords : Longitudinal and Tranverse reinforcement

Saturday, 3 May 2014

Lightning Protection Specification

Lightning Protection  Specification:
keywords: site evaluation, NFPA 780, NFPA 850, IEEE 142, IEC61024, Plant Earthing System, protection devices for site structures and equipment.

Thursday, 1 May 2014

LUX Simulation for double carriageway highway 7.0 wide

Number of Lane = 2
Carriageway Width = 2 x 3.5m

Lamp post elevation = 12.0m
Lamp post spacing = 40.0m

Max Lux = 69
Min Lux = 13
Average Lux = 37

Category : ELectrical and Highway Engineering

Friday, 11 April 2014

Falling Weight Deflectometer

Keywords: Falling Weight deflectometer , testing device, physical properties of soil, impart a load pulse, load cell, rolling vehicle wheel, load plate, pavement.

Sunday, 19 January 2014

Bill of Quantity of Carpentry and Joinery

Bill of Quantity of Carpentry and Joinery

keywords : doors, frame, ironmongery, single leaf flush door, fixed glass louvers, glass blades