Friday, 30 April 2010

Pile Load Test - Load Test Record Part 1

Test Record





















PAge 1






















Page 2






















Page 3





















Page 4






















Page 5

Thursday, 29 April 2010

Pile Load Test - Load Test Record






















Pile Load Test - Load Test Record

Pile Load Test - Geenral Arrangement of Test System















Test frame and Load Cell arrangment

Pile Load Test - Loading Schedule

Pile Load Test - Test Procedure





















Pile Load Test - Test Procedure
- Maintained Load Method
- kentledge set up
- hydraulic jack
- settlement measurement

Wednesday, 28 April 2010

Pile LOad Test - Test Result























Test result of pile load test.

Total Settlement and Residual Settlement.

Pile Load Test - Test Report - Content Page






















Pile Load Test - Test Report - Content Page

- Testing Procedure
- General Arrangement of Test System
- Field Record of Test Pile
- Composite Plot of Load/Displacement / Time
- Pile Driving Record
- Dynamic Test Result (PDA)

Pile Load Test - Compression - Main Page






















Pile Load Test - Compression for Steel Pipe Pile

Wednesday, 21 April 2010

Guide to Preparation of Memorandum of Agreement for Subcontract Works

Guide to Preparation of Memorandum of Agreement for Subcontract Works;

The guide is based on an actual agreement between two international consultant for a civil engineering project.

The important clause covered in the Agreement are as follows:

Date of the Agreement.
Definition and Interpretation
Scope of Services.
Execution of Service.
Duration of Agreement
Change Order
Invoicing Procedure
Warranty
Laws and Regulation
Liability and Indemnity
Insurance
Termination
Assignment
Performance Bond
Taxes.

Subcontract Agreement - Page 21- Signatory

Subcontract Agreement - Page 20 - Taxes and Governing Law

Subcontrcat Agreement - Page 19 - Performance Bond

Subcontract Agreement - Page 18 - Assingment and Arbitration





















Condition for further subcontract of the assignment and
Agreement on arbitration if there is any dispute

Tuesday, 20 April 2010

Subcontract Agreement - Page 17 - Termination






















Termination clause

Subcontract Agreement - Page 16 - Insurance






















Subcontract Agreement - Page 16 - Insurance

- Professional Indemnity Insurance

Subcontract Agreement - Page 15 - Liability and Indemnity























Subcontract Agreement - Page 13 - Liability and Indemnity

Subcontract Agreement - Page 14 - Laws and Regulation and Confidentiality





















Subcontract Agreement - Page 14 - Laws and Regulation and Confidentiality

- infringement of patent
- intellectual properties
- copyright

Subcontract Agreement - Page 13 - Warranty





















The subconsultant are required to provide service during the defect liability period at their own cost in case there are deficiency discovered.

Monday, 19 April 2010

Subcontract Agreement - Page 12 - Invoice





















Note : Clause 6.6 allows partial payment in case of dispute.

Subcontract Agreement - Page 11 - Invoicing Procedure




















The invoicing procedure is described in this page.

Subconsultant Agreement - Page 10 - Fees and Term of Payment























The Agreement should states the fees for the services and the term of payment. The fees can be based on a Lump Sum Cost or based on percentage of project value or can be based on man hours the subconsultant needs to provide.

Subcontract Agreement -- Page 9 - Change Order























Sometime Client may instruct the Consultant or PMC to provide additional services not stipulated in the agreement and this may require additional man hours. 'Change Order' clause can be use for such event.

Subcontract Agreement - Page 8 - Duration of Agreement and Services






















Subcontract Agreement - Page 8 - Duration of Agreement and Services

The subcontract work should have a Effective Start date and End date. This page provides relevant clause for the duration of the agreement.

There is also a clause to cover the case of delay by the subconsultant.

Subcontract Agreement - Page 7 - Execution of Services




















Subcontract Agreement - Page 7 - Execution of Services (cont)
This page covers the following :

- act or omission of Subconsultant
- notification to PMC.

Subcontract Agreement - Page 6 - Execution of Services




















Subcontract Agreement - Page 6 - Execution of Services

This page describes how the subconsultant should perform his duties

Subcontract Agreement - Page 5






















Clause 2.3 defines the key personnel availability and condition for replacement of key personnels.


Clause 2.4 describes the reporting structure..

Sunday, 18 April 2010

Subcintract Agreement - Page 4 -Scope of Subcontract





















Something to note from this page:
[1].......contra preferendum rule of intepretation...
[2]......... privity of contract .....

Subcontract Agreement - Page 3 - Definitions and Intepretations (cont)





















About this page :

This page continues with several other important schedules such as :
Key Personnel for the project
Performance Bond.

Other terms are also defined:
SERVICES, PMC, CONTRACT, KEY PERSONNEL

Subcontract Agreement - Page 2 - Definitions and Intepretations























About this page :

This page of the Agreement define several terms such as
SUBCONTRACT and CONTRACT.

Also define here are several schedule:
  • scope of services
  • payment schedule
  • programme and rates

Subcontract Agreement - Page 1 - Date of the Agreement






















About this page:
  • This page indicates the date of the Agreement
  • Company A from Australia is providing a PMC service to DISINI CHEMICAL and had engaged Company B from Malaysia as a sub consultant.
  • Both Company A and B registered address need to be mentioned clearly.

Subconsultant Agreement - Cover Page























A Subconsultant Agreement is necessary in a case your company hire another expertise to carry out work that you intent to out source.

The sample cover page of the agreement shows and agreement between Company A and Company B for a Port Project.