Monday, 10 October 2011

Power Transmission Tower Foundation Design

                        Page 2
 (Loading and Maximum Foundation Force)



















Page 3 (Broken Conductor)





















   






Page 4 ( Still Air Condition)






















Page 5 (Pile Cap Design / Stability Check)






Page6 (Tower Foundation Layout)



Page 7 ( Geotechnical Calculation - Pile Length and Capacity)







Page 8 ( Pile Design - Uplift and Compression Capacity)


Sunday, 21 August 2011

Sieve Analysis of Fine and Coarse Aggregate

Sample Laboratory Sheet from Sieve Analysis of Fine and Coarse Aggregate

精细与粗集料筛分析样本化验单



Monday, 15 August 2011

Escape Velocity

How to calculate escape velocity of a rocket.

Tuesday, 9 August 2011

Alkanes


Chemical formula for alkanes : methanes, ethane , propane and decane

Mathematics: Graphical Representation of Inequality Notation


Mathematics: Graphical Representation of Inequality Notation
[keywords: infinity, equal, not more, not less]




Wednesday, 6 July 2011

Detail of Bedding Storm Drainage Pipe Detail


Detail of Bedding for Storm Drainage Pipe Detail:
keywords: { road pavement , clear cover,  300mm diameter, concrete grade 20} 

Thursday, 31 March 2011

Schedule of Payment

Schedule of Payment is very important for any construction project. It ensures the contractors are paid adequately for the progress of the works done. An example of a payment schedule of a marine facilities for a petrochemical project is shown below for reference.

Tuesday, 15 February 2011

Spun Pile Set Criteria Calculation - Jetty Construction.

Spun Pile Set Criteria Calculation - Jetty Construction.