Thursday, 12 February 2015

Fire Hydrant Hose Reel Detail























keywords:
union, elbow, gate valve , G.I Pipe, wall mounting detail

Tuesday, 3 February 2015

Timber Sleeper for Railway Track - Tolerances Specification























Timber Sleeper for Railway Track - Tolerances Specification:

keywords:
Merbau, Chengal,  parallelism, tolerances,


Wednesday, 28 January 2015

Temporary Bridge for Access Road





















Span -7m to 12m
Material :

H beam -305x305x223kg/m
Timber Plank - 50 x 100
Steel Plate - 2m x 2m x 10mm

Monday, 26 January 2015

Airport - Baggage Handling System
















Service Level expected for Baggage Handling System for International Airport.
-Check in Service Operating Hours
-Operating Time of Check In Service
-Flight Load Handling Time
-Baggage Delivery Time





Thursday, 18 December 2014

Hydrostatic Test of Pipeline























Hydrostatic Test of Pipeline

keywords:

pipeline bundle and risers, hydro test pressure, LPG, Nitrogen, Potable Water, Utility Water, Diesel, Fuel Oil, Gas, operating pressure, Bar


Saturday, 13 December 2014

Project Schedule - Level 1 - Construction of Marine Facilities - EPCC Contract







Project Schedule - Level 1 - Construction of Marine Facilities - EPCC Contract

keywords:

Engineering
 - Detail Design

Procurement
- Steel Piles , Structural Steel,  QRH, Capstan, Bollard, Cathodic Protection. Rocks, Fenders, Navigational Aids, Geotextile, Flexslabs,

Construction:
Jetty, Beach Protection, Roadways, Dredging, Precast






Friday, 12 December 2014

Steelwork - Beam to Column Connection Detail






















Steelwork - Beam to Column Connection Detail



Monday, 8 December 2014

LPG Compressor Shed - Structural Steel Frame

















Plan View



















Purlin Layout
















Cross Section of Shed
















Longitudinal Truss


















Main Rafter

Friday, 21 November 2014

Wednesday, 5 November 2014

Steelwork Standard Detailing - Horizontal Bracing Connection






















Standard detail steel connection ( angle to main steel beam)

Friday, 24 October 2014

Hydro Power Project - Scour Gate - Pulling Force






















Hydro Power project - Calculation of Scour Gate pulling force for intake plant.

Tuesday, 26 August 2014

Internal Audit Schedule - Chart
















A typical chart showing how internal audit can be schedule.

Monday, 25 August 2014

Architectural Detailing - Standard staircase













Architectural Detailing
- Standard staircase - raisers, nose detailing - screed 1:3 cement content and railing height.




Monday, 4 August 2014

Silt Fence - Construction of Breakwater














Diagram indicating how silt screen/ curtain are being used during the construction of breakwater.

Sunday, 6 July 2014

Vehicular Box Culvert Design
















Vehicular Box Culvert .

Size : 10m wide  x 5 m height and about 2m fill
Renforcement detail

Friday, 30 May 2014

Design of Grating Cover



















page - 1




















page -2




















keywords : HA Loading, Calculation, desig, 100 KN, BS5400 Clause 6 , main trench, safe working stress,
175 n/mm2

Sunday, 25 May 2014

Pipeline Detection Method



















Pipeline detection - manual approach

Saturday, 24 May 2014

Aircondition Duct Specification



















Aircondition Duct Specification
keywords: duct, fibrglass, rockwool, galvanised steel perforated sheet,  WCP supply air, return air duct, absorbtion material

Wednesday, 21 May 2014

Elastomeric Bearing Design



Design calculation of Elastomeric Bearing for bridges.
keywords: rubber layer thickness, shear deflection, vertical deflection, compression stiffness

Tuesday, 6 May 2014

International Roughness Index (IRI) Criteria for Highway Project




















(IRI) International Roughness Index for roadworks.
keywords : pavement surface, highway, roadworks, project, test, Single Track IRI, Wearing course surfacing, Binder Course Surfacing, Lane IRI Value, Road profile, Grade